FRTB is often described as a market risk capital rule. In practice it is a data, model and governance programme. The banks that struggle are rarely the ones that cannot calculate a sensitivity; they are the ones that discover too late that their trading book boundary, desk structure, risk-factor data or validation evidence cannot support the approach they intended to use.
This checklist is a practical way to structure the work. It is not a substitute for the PRA rulebook or legal advice, but it reflects the questions I see in FRTB, IMM and model validation programmes at UK banks and UK branches of international institutions.
Why FRTB is different
The standardised approach is a large implementation exercise. The internal models approach is a model approval exercise. FRTB asks for both, and it connects them through a stricter trading book boundary, desk-level permissions, P&L attribution, back-testing and non-modellable risk factors (NMRF).
That means a programme cannot be run as a reporting change at the end of the chain. The data, model inventory, desk structure and control environment all have to be designed together.
The practical test: can you explain, desk by desk, which FRTB approach applies, why the desk qualifies, which risk factors drive the capital number, and what evidence a regulator or internal auditor would need to see?
The implementation checklist
1. Scope, governance and regulatory engagement
- Define which legal entities, branches and books are in scope, and how UK requirements interact with home-regulator requirements for branches.
- Name an accountable executive and a programme owner with authority across risk, finance and technology.
- Agree the PRA engagement plan: what will be submitted, when, and who owns each part of the evidence.
- Set up a single FRTB model and issue inventory, with owners, status and remediation dates.
- Agree the internal audit and validation touchpoints early, not after the model is built.
2. Trading book boundary and desk structure
- Review every instrument and position against the trading book/banking book boundary rules.
- Define desks in a way that is consistent with how the business is managed and how models will be approved.
- Document desk mandates, hedging relationships and any reclassification decisions.
- Test whether the desk structure supports the intended IMA scope; a desk that cannot pass the tests should not be assumed to be in scope.
- Agree the ongoing governance for desk changes and new products.
3. Standardised approach
- Implement the sensitivities-based method, default risk charge and residual risk add-on for the in-scope portfolios.
- Map risk factors and sensitivities to the regulatory taxonomy, including curvature and correlation scenarios.
- Build controls for sensitivity generation, aggregation and sign conventions.
- Reconcile SA capital to front-office and risk-system outputs; investigate material differences.
- Document the calculation, data sources and change process.
4. IMA readiness
- Confirm the expected scope of model approval, desk by desk and risk factor by risk factor.
- Implement expected shortfall with the required liquidity horizons and stressed calibration.
- Design the P&L attribution test and back-testing framework before the model is finalised.
- Define the treatment of non-modellable risk factors and the data standards for observability.
- Prepare the model documentation and evidence that will support the internal model application.
5. P&L attribution and back-testing
- Agree the hypothetical and risk-theoretical P&L definitions, and the data lineage behind each.
- Test the attribution test on historical data, not only on a short recent window.
- Define the escalation path when a desk fails the test, including remediation and temporary treatment.
- Back-test at the desk level, with clear thresholds, exceptions and governance.
- Document the results that will be shown to the regulator, internal audit and the model risk committee.
6. Non-modellable risk factors
- Define the observability criteria and the evidence required for each risk factor.
- Build a risk-factor inventory that links positions, data, proxies and NMRF status.
- Assess the capital impact of NMRF treatment under stress as well as in the base case.
- Agree the process for moving a risk factor between modellable and non-modellable status.
- Document the proxy methodology and its limitations.
7. Data and infrastructure
- Map data lineage from source systems to the FRTB calculation, including corrections and overrides.
- Assess completeness, timeliness and quality at the risk-factor level.
- Confirm the calculation engine can support the required scenarios, sensitivities and stress periods.
- Define the control environment for data changes, model changes and re-runs.
- Agree the operational reporting pack for risk, finance and the regulator.
8. Model validation and documentation
- Validate the methodology, implementation and calibration independently of the build team.
- Use benchmark models and independent re-pricing for material portfolios.
- Test the P&L attribution and back-testing framework, not only the risk model.
- Document assumptions, limitations, compensating controls and the model risk rating.
- Ensure the validation evidence is available before the application, not assembled afterwards.
9. Capital and business impact
- Quantify the capital impact under SA and the intended IMA scope, including boundary and NMRF effects.
- Model the sensitivity to desk structure, risk-factor observability and stress calibration.
- Discuss the implications with the trading desks and finance before the numbers are final.
- Identify where the capital outcome changes business decisions, and escalate early.
- Prepare a clear narrative for the board and regulator.
10. Operating model and change control
- Define who owns the FRTB calculation, the model inventory, the data and the evidence pack.
- Integrate FRTB into business-as-usual risk reporting and change management.
- Set the controls for new products, desk changes and model changes.
- Agree the ongoing validation, back-testing and regulatory reporting cycle.
- Plan the first post-implementation review before go-live, not after.
Common failure modes
- Treating FRTB as a reporting project. The data, desk structure and validation work are the programme; the report is the output.
- Leaving P&L attribution and back-testing until the end. These tests shape the model scope and the capital outcome.
- Underestimating NMRF. Observability is a data and governance question, not a calculation detail.
- Assuming every desk will be approved. Desk-level permissions require evidence and ongoing monitoring.
- Validating after implementation. Independent challenge is more useful before the design is fixed.
- No clear regulatory evidence pack. Regulators and auditors need a traceable argument, not a folder of outputs.
What good looks like
A credible FRTB programme has a short, defensible story: these are the in-scope books and desks; these are the approaches and why; these are the material risk factors and their data status; these are the model limitations and controls; these are the capital outcomes and the evidence. Every number can be traced, and every exception has an owner.
The programme does not need to be perfect before the first regulatory conversation. It does need to be honest, structured and evidence-led.
How I can help
I support UK banks and UK branches of international institutions with:
- FRTB gap analysis and remediation planning
- Trading book boundary and desk-structure review
- SA implementation and independent review
- IMA readiness, P&L attribution and back-testing
- NMRF and risk-factor data assessments
- Independent model validation and regulatory evidence
If you are preparing a programme, a model application or an internal audit review, a focused diagnostic is often the fastest way to find the issues that matter. See my regulatory adviceand UK banking pages, orstart a conversation.
